This allows the energy companies (SDG&E, PG&E, SCE, Liberty, Bear Valley, and PacifiCorp) to shut off power to prevent fires when strong winds, heat events, and related conditions are present. document.getElementById('copyright').innerHTML = new Date().getFullYear(); %PDF-1.5
Our permit pulling service includes the appropriate City Building and Safety Temporary Power permit, Southern California Edison and the Department of Water and Power application requirements. These directives resulted in up to 1,150 MW of new supply- and demand-side resources, including nearly 200 MW of voluntary enrollment in the ELRP. Were going to be inspecting approximately 5,000 poles a week.. The members include Southern California Edison, Verizon, AT&T, Southern California Gas Company, San Diego Gas and Electric and Pacific Gas and Electric. Inspecting, repairing and upgrading every pole in SCEs service territory is part of the work the utility does routinely. If you wouldnt say it in front of your mother, then there is a good chance it falls outside of our guidelines. They know how to work safely around power lines that are energized," he said. We take it for granted. SCE and municipal assets in Santa Monica and Huntington Park will be transformed into EV public charging stations as part of a pilot program that could serve as a model for other cities. POLES The minimum size of a wood pole used to support low voltage (below 1000 Volts) conductors in conformance with Article 225 of the California Electrical Code (CEC) for outdoor feeders and branch circuits shall be 6 inches by 6 inches (nominal) if square, or have a diameter of at least 5 . Maintaining records for the complete life of each pole, instead for a certain number of years. We're inspecting poles, and repairing or replacing those that don't meet required standards. This new offering allows residential customers to get paid the same way business customers are paid to reduce energy demand at key times. Southern California Edison, nations largest high-voltage transmission system, Committed to Safe, Reliable, Affordable Power. Power Plant Compliance and Siting. This photo shows our underground power pole installed however; we were unable to complete our scope of work because Southern California Edison had not yet installed the transformer. Your local planner will work with you every step of the way throughout your entire project, including the design, construction, and scheduling the installation of the electrical system to serve your project. The electric utilities will provide updates on the status of preparation efforts and coordination with public safety partners, critical infrastructure and facilities, and customers, including those most vulnerable or with access and functional needs. Most people do not think too much about temporary power. Southern California Edison 8631 Rush Street Rosemead, CA 91770. Electrical corporations with fewer than 100,000 customer accounts in California offer a 20% discount. By Tuesday at 6 p.m., power to all but 7,000 had been restored. Requirements of Southern California Edison. On January 11, 2018, the CPUC approved the first transportation electrification applications under SB 350 from the three large investor-owned utilities. ACO has been providing temporary power solutions, including temporary power poles for construction projects since 1989. The temporary power meter pole is installed closest to the utility source, the additional temporary power poles are installed every 80 feet to the construction trailer. text available as: pdf (15mb) . The CPUC oversees the utilities preparation for and execution of PSPS events and has been driving the utilities to improve in response to lessons learned from previous PSPS events. 1997, ch. document.getElementById('copyright').innerHTML = new Date().getFullYear(); Smart investments in infrastructure maintenance are an important part of keeping power flowing safely and reliably well into the future. That contrasts with $ 430, 000 per mile for covered conductors, which is a key . It depends what you want from Clean Power Alliance. Providing $22.5 million in incentives to install smart thermostats in hot climate zones.The smart thermostats will allow customers to reduce air conditioning usage a few degrees during critical times and get paid for the energy savings, with special protection for low-income customers that qualify for the CPUCs, California Alternate Rates for Energy (CARE) or Family Electric Rate Assistance (FERA) Programs. A 2013 study of Southern California Edisons utility poles, which was commissioned following concerns of the fires caused by downed poles, found that 22.3% of the 5,006 poles examined failed to meet state utility standards. Edison Energy and its subsidiaries are not the same company as Southern California Edison, the utility, and they are not regulated by the California Public A 2013 study of Southern California Edison's utility poles, which was commissioned following concerns of the fires caused by downed poles . Recent advances in technology have also enabled utilities to use more sophisticated inspection and analysis software to calculate the appropriate pole load a necessity since more equipment than ever is being installed by other telecommunications or cable companies. In some cases, more clearance is needed on projects which will require us to install a black diamond pole. 30, 2020: SED served a copy of its Public Report on the Late 2019 PSPS Events to the service list of I.19-11-013, Nov. 1, 2019: Consumer Protections and Resources for Wildfire Victims, Cal OES - Governor's Office of Emergency Services, Info on the Self-Generation Incentive Program, Looking for information on power outages? An easement is the legal right for someone to access and control land belonging to somebody else. In addition to repairing or replacing poles, the four companies involved are said to be working together to improve pole-loading practices. See the chart below showing the general scope and deliverables for completing a project through SCEs Local Planning department: Click to download the PDF version of the timeline. After all, there is usually an outlet nearby to plug into. 2 Transmission Line Project . Our first rooftop solar photovoltaic installation, in Fontana, Calif., consisted of 33,700 solar panels. 2 million per mile. The California Public Utilities Commission (CPUC), in ongoing efforts to hold utilities accountable for executing safe and appropriate Public Safety Power Shutoff (PSPS) events, is requiring the states electric utilities to publicly present on their preparedness for PSPS events in 2022 at two virtual briefings, as follows: WHAT:The electric utilities will provide updates on the status of preparation efforts and coordination with public safety partners, critical infrastructure and facilities, and customers, including those most vulnerable or with access and functional needs. CALL FOR "ROUGH SERVICE RELEASE" INSPECTION: Once the work described in Step 7, the contractor shall call Ed Hotz, City Building Inspector at (949) By 2045, SCEs grid will need to supply significantly more carbon-free electricity to itscustomers to replace other sources of energy that emit greenhouse gases. Southern California Edison's Devers-Palo Verde 500 kV No. Remember to start early! <>
We have generated solar power since the 1980s. 1 0 obj
Utilizing state-developed maps that depict high fire-threat districts. FLO will provide the charging stations for the pilot program, which is funded by a $750,000 award from the California Energy Commission. The report's estimated cost for California's other investor-owned utility, Southern California Edison, which also has sparked devastating blazes, was $ 1. endobj
Prior CPUC Decisions directed the states investor-owned utilities to procure incremental capacity beyond the current 15 percent resource adequacy planning reserve margin to serve peak and net peak demand in 2021 and 2022, with a preference for energy storage. The CCA offers three rate plans to its customers: One with a 36% renewable energy mix that the alliance says is 1% cheaper than Edison's base . 2/27/18. In 2012, we ruled that California Public Utilities Code Sections 451 and 399.2 (a) give electric utilities authority to shut off the electric power to protect public safety. Rule 20 C - The vast majority of costs are paid by the local city implementing the project. In 2017, fires raged in Santa Rosa, Los Angeles, and Ventura, making it one of Californias most devastating wildfire seasons. Many newly developed areas have underground power sources, eliminating the unappealing overhead power poles in the street. Our crews have the experience, resources, and equipment to provide you with the temporary power system you need. //-->